project

PRODUCTS SERVICE & SPARE PARTS PROJECTS ABOUT TRUEMAX CONTACT US
Home >  project >  Concrete Machinery >  DOHA METRO-GREEN LINE

DOHA METRO-GREEN LINE

Adding time: 2019.08.30

Share
Concrete Placing Boom in Malaysia

Project Description:

Total construction mileage 300km include 100 stations, which has both underground lines and elevated lines

The project’s D&B contract of the Green line underground project has been given to a JV led by PORR Bau, Saudi Bin Laden Group and Hamad Bin Khalid Contracting.


Truemax Solutions:

Total concrete equipments solution and accessory. Included the mixer, mold, gantry crane, pumping, placing, galvanize steel walk way etc.    


Job Site: Qatar